Xcel West Main Gas Pipeline

Posted in Businesson Aug 4, 2014

Dear Xcel Energy,

Your communications about the Xcel West Main Gas Pipeline construction through Fort Collins have been misleading.  Considerations to Fort Collins motorists have been minimal.

In an April 21 article in the Coloradoan, Kevin Duggan reports that East bound Drake Road would be closed for two weeks for construction.  15 weeks later and there is still construction on Drake Road causing lane closures.

In a June 30 article in the Coloradoan, Kevin Duggan reports that work should wrap up that week, by July 4, along Drake and Timberline, except that it hasn’t.

On your own website you state, “There are currently no road or lane closures in place for work along South Timberline Road north of the Drake Road intersection.” (Pulled 8:45am, August 4).  Except that as I drove by this morning I noticed that a South bound lane was closed for more construction.

I understand the need for infrastructure upgrades.  But the importance of such upgrades are no excuse for poor communications with the public.  Not only is information passed through the newspaper or your website incorrect, but roadside information has been almost non-existent.  There have been no signs informing the public of possible delays.  Even “LEFT LANE CLOSED AHEAD” signs are located low to the ground on the right side of the road where they often can’t be seen by drivers in the left lane.  That is not being “responsible by nature.”

Maybe you are wrapping things up (although I’ve thought that a few times before) and it is too late to make this plea, but I request that you get your communications act together and start being more forthcoming with the public about lane closures, possible delays, and the realistic time frames for such activities.

Sincerely,

Jacob Brunson